Domestic/International terminal connector under construction at Nur-Sultan airport

NUR-SULTAN. KAZINFORM Construction of a new connector began at the Nursultan Nazarbayev International Airport.

photo: QAZINFORM

The 90m-long passageway will connect domestic and international terminals (T1, T2). Its total area will be 1,000 sq m. The connector will let the passengers walk directly from one terminal to another staying inside.


The project will be completed in October 2019.