Three projects totaling KZT 417 mln implemented in Petropavlovsk within forced industrialization program

PETROPAVLOVSK. January 14. KAZINFORM /Sergei Kuznetsov/ Three projects totaling KZT 417 mln were realized in Petropavlovsk last year within the Program of Forced Industrial-Innovative Development for 2010-2014.
None
None

"ZIKSTO" JSC developed and put into operation a new model of covered hopper car for grain transporting of KZT 127 mln cost. Production of a specialized platform - container car - was launched.

About 200 grain carriers and 100 container cars are planned to be produced for "Kazakhstan Temir Zholy" national company.

A plant for production of dry foam concrete mixtures costing over KZT 182 mln was put into operation. Designed capacity of the plant is over 36 thousand tons per year.

15 units of heat-transfer equipment were mastered at the "Petropavlovsk Heavy Machine Building Plant" JSC. Samples of new equipment for oil-refining industry were developed and produced at the plant as well.

Most popular
See All