President visits Zhaiykmunai LLP oil terminal
14:21, 13 June 2009
URALSK. June 13. KAZINFORM /Gaissagali Seitak/ Head of the State Nursultan Nazarbayev has surveyed the course of construction of Zhaiykmunai LLP oil terminal in Beles village; Kazinform reports.
According to Director General Vyacheslav Druzhinin, there is an oil-producing complex at the Chinarev minefield, the reserves of which amounts to 48.7 bln cubic meters of gas and 35 mln tons of oil. It consists of an installation on extraction of 400,000 tons of oil per year, pipeline length of 120 km on Chinarev-Beles route, crude oil loading terminal of capacity of 2 mln tones and installation of oil demercaptanization. After completion of construction of crude oil rail unloading terminal all work on exploitation, transportation and oil implementation will be systemized. Installation of the complex on gas conversion process will allow to produce 1.5 mln cubic meters of conditioned natural gas, 140,000 tones of liquified natural gas and 750,000 tones of gas condensate.
Oblast?s akim Baktygozha Izmukhambetov informed the Head of the State of the work on gasification of settlements. The Kazakh President attracted attention to the moment that in the future the conditioned natural gas of Zhaiykmunai LLP should be used for ensuring needs of the country?s south regions.