Water supply restored in West Kazakhstan within Road Map
15:50, 26 November 2009
URALSK. November 26. KAZINFORM /Gaisagali Yeraly/ KZT 307.2 mln was disbursed in West Kazakhstan region for water supply restoration within the Road Map, the regional construction department reports.
Water supply was restored in Zhuban, Zelyenyi, Pervosvet, Koshankol villages. 347 people were involved in restoration works. 39.6 km long water pipeline will be put into operation by the end of the year. 5 600 will be provided with drinking water due to it.