Kazakh Prime Minister charged Oil & Gas Ministry to develop master plan of gasification in 2013

ASTANA. January 28. KAZINFORM Today, at the enlarged session of the board of the Ministry of Oil and Gas, Prime Minister of Kazakhstan Serik Akhmetov charged the Ministry to develop a master of gasification in 2013.

photo: QAZINFORM

"I charge your Ministry to develop a master plan of gasification this year. During this work, special attention should be paid to the issues of providing rural localities with the access to the gas supply network. It is an important issue," S. Akhmetov noted.

Besides, the Premier gave instructions to put into operation the first stage of the Beineu-Bozoi-Shymkent gas supply network.

"In accordance with the instructions of the President, it is necessary to put into operation the first stage of the Beineu-Bozoi-Shymkent gas supply network and finish all the preparation work on the second stage of the Beineu-Bozoi network and begin its implementation in 2013 instead of planned before 2014," S. Akhmetov emphasized.

Source: www.primeminister.kz